ACS PROJECTS

20220502_204143114_iOS.heic

Greenvale Clearing and Access

Construction of access tracks (new and existing), access tracks from main roads to the Transmission Line easement, line easement clearing works, tower pad construction, construction of infrastructure pads, installation/replacement of fences and gates, and creek crossings. (Project Value $3.5M)

​Project Energy Connect (PEC)

Construction of a new transmission line for ElectraNet spanning 192km between Renmark to Robertstown, connecting NSW to SA.

  • Clearing and mulching of access roads, tower pads and easement

  • Camp and laydown yard construction

  • Road and pad construction, capping and maintenance

  • Heavy Haulage – Low Loaders, 8x8 trucks and crane trucks

  • Commenced March 2021 – scheduled completion end 2022

processed-EE92E95F-C81A-4F9A-89FB-F11EA1656F70-8A89D374-934B-4F69-BF6A-B5CB885C6782.jpeg

GENEX Transmission Line Project

Construction of 186km Transmission Line running from Kidston Sub-Station to Mount Fox Switching Station.

  • Clearing and mulching of access roads, tower pads and easement

  • Road Construction 

  • Commenced October 2022 – scheduled completion end 2023

processed-649E81EF-9888-44C3-BEFE-868E090BEC53-F0DC2EFA-6E35-44B3-BC38-440D80A97D7D.jpeg

Anglo Coal Realignment Project

Access and Clearing Package - Moranbah

  • Clearing for access roads and line easement

  • Layover, Mulching and hand clearing

  • Construction of access tracks

  • New build, existing upgrade and capping

  • Tower pad and infrastructure pad construction

20211031_210519301_iOS.heic

Monkland Industrial Park Subdivision

Design and construct 12 lot industrial subdivision Monkland Qld

  • Design and engineering

  • Bulk and detailed earthworks

  • Retaining walls and batters

  • Roads and kerbing

  • Electrical and sewer

  • Stormwater and culverts

  • Landscaping

Eyre Peninsula Link - Access and clearing

Construction of new 132 kV and 275 kV double circuit transmission lines for ElectraNet spanning 262 Km from Whyalla to Port Lincoln.

ACS scope includes-

  • Clearing and mulching of access roads, tower pads and easement

  • Camp and laydown yard construction

  • Road and pad construction, capping and maintenance

  • Heavy Haulage – Low Loaders, 8x8 trucks and crane trucks

Nambour Landfill Project - QLD

​

Construction of a new cell to the Nambour Waste facility​

​

  • Bulk and detailed earthworks

  • Wet/Dry plant hire

Sunshine Coast Airport Expansion Project

John Holland Group - QLD

​​

​​

  • Bulk and detailed earthworks (sand rehandling)

  • Drainage

  • Wet plant hire

  • Crew peak size 17 machines

H2H1_edited.jpg

Hill to Hill Project

UGL - South Australia

​

  • Total earthworks package

  • Clearing, access roads and tower pad construction (275km, Port Augusta to Olympic Dam)

  • Road maintenance

  • Heavy Haulage – 8x8 crane trucks, 8x8 truck and quads, low loaders, large telehandlers

  • Crew peak size 32 machines

GCSW_edited_edited.jpg

John Holland - Gold Coast Seaway Project

​

​​

  • Wet Plant hire

  • Bulk and detailed earthworks

  • FRP

  • Asphalt

b.png

MH6 Pavement Upgrade

Abergeldie - QLD

​

  • Detailed earthworks

  • Asphalt

  • FRP

UGL_edited_edited.jpg

UGL - Eagans Hill Sub Station

​

  • Electrical pits and conduits

  • Stormwater

  • Detailed earthworks

  • FRP

IMG_0603_edited_edited.jpg

Fulton Hogan – Toll Tennyson Rail Terminal Pavement Replacement Works

​​

  • Bulk and detailed earthworks